Cinnamon Bore Project
Install 12″ C900 PVC pipe crossing under under US Hwy 6 with a 24″ bore and connect to new well and pump
- Date: April 2016
- Project Type: Pipeline Construction
About this Project
This project consisted of installing 12″ PVC pipe from a new well pump to an existing irrigation system. The pipeline had to cross under a major interstate highway at a diagonal for proper right of way alignment.
- Cal Trans Permits Pulled
- Jack Bore Under Highway
- Install 220′ C900 in a 24″ Steel Casing
- Fabricate Steel Connection Points for PVC Attachment
- Connect and extend 1.2 miles of 12″ PVC from either end of C900 to well pump and irrigation system
- Restore Road Shoulders
- Set a 400 amp service for Well Pump
- Installed 250 HP Variable Frequency Drive for Motor Contro