Cinnamon Bore Project

Install 12″ C900 PVC pipe crossing under under US Hwy 6 with a 24″ bore and connect to new well and pump

  • Date:  April 2016
  • Project Type: Pipeline Construction

About this Project

This project consisted of installing 12″ PVC pipe from a new well pump to an existing irrigation system.  The pipeline had to cross under a major interstate highway at a diagonal for proper right of way alignment.

  • Cal Trans Permits Pulled
  • Jack Bore Under Highway
  • Install 220′ C900 in a 24″ Steel Casing
  • Fabricate Steel Connection Points for PVC Attachment
  • Connect and extend 1.2 miles of 12″ PVC from either end of C900 to well pump and irrigation system
  • Restore Road Shoulders 
  • Set a 400 amp service for Well Pump
  • Installed 250 HP Variable Frequency Drive for Motor Contro